Rio Tinto Minerals

Rio Tinto Minerals

Rio Tinto Minerals

Fast-track design-assist project to create a new centralized R&D lab. Work included the integration of three existing mineral analysis labs into one location, and the addition of a new large research lab area and related administrative areas.

Owner | Rio Tinto Materials
Architect | OZ Architecture
Engineer | Swanson Rink
General contractor | Fransen Pittman
Contract value | $2,263,950
Size | 140,000