Charles Hay Elementary School

Charles Hay Elementary School Scope of work for this new two-story replacement elementary school included all the electrical lighting and controls, generator, fire alarm, BDA system, cable tray and low-voltage rough-in. Owner | Englewood Schools/CBRE Engineer | ME Group General contractor | Fransen Pittman Contract value | $1,300,000 Size |…

Clayton Elementary School

Clayton Elementary School Scope of work at this new two-story replacement elementary school included all the electrical lighting and controls, generator, fire alarm, BDA system, cable tray and low-voltage rough-in. Owner | Englewood Schools/CBRE Engineer | ME Group General contractor | Fransen Pittman Contract value | $1,393,062 Size | 59,548…

New Vision Charter School

New Vision Charter School Scope for this new charter school in Loveland included full electrical scope with emergency system, LED lighting and controls, turn-key fire alarm system and low0voltage systems rough-in. Owner | New Vision Charter School Engineer | MEP Engineering, Inc. General contractor | Fransen Pittman Contract value |…

Fairview High School Renovation

Fairview High School Renovation For this high school renovation, Duro Electric updated electrical service, replaced existing generator with a new one, upgraded lighting fixtures, updated fire alarm system and installed new lighting controls. Owner | Boulder Valley School District Engineer | AE Design General contractor | Adolfson & Peterson Contract…

Red Rocks Community College

Red Rocks Community College This new, ground-up structure included electrical distribution, generator/EM distribution, branch wiring and power, installation of LED lighting throughout, lighting control system to meet AHJ requirements, power connections to mechanical equipment, fire alarm system and rough-in for low-voltage systems.  The project also had an existing structure renovation…

Emerald Elementary School

Emerald Elementary School This project was a new, ground-up school for the Boulder Valley School District. Scope of work included electrical distribution, generator/EM distribution, branch wiring and power, LED lighting throughout, lighting control system to meet AHJ requirements, power connections to mechanical equipment, fire alarm system and turn-key low-voltage systems.…

Douglass Elementary School

Douglass Elementary School This project was a new, ground-up school for the Boulder Valley School District. Scope of work included electrical distribution, generator/EM distribution, branch wiring and power, LED lighting throughout, lighting control system to meet AHJ requirements, power connections to mechanical equipment, fire alarm system and turn-key low-voltage systems.…

Denver Central Platte Valley Campus

Denver Central Platte Valley Campus Design-build project for a 33-acre maintenance facility consisting of six buildings: office/warehouse, fleet maintenance, heated vehicle storage, fuel/wash, covered parking and magnesium chloride/salt dome. LEED Gold certified project. Owner | City and County of Denver Architect | RNL Design Engineer | MKK Consulting General contractor |…

St. Vrain

St. Vrain New three-story building for Boulder County Health and Human Services. The project was designed to meet LEED Platinum and was connected to an existing three-story building that continued to operate throughout the construction process. Work included all new electrical systems-distribution switchboards, panels, lighting and controls systems, and electric…
1 2 3