Topgolf

Topgolf Topgolf is a high-end driving range and entertainment facility. The three-story building has three bars, event spaces, office space, three kitchen spaces and a restaurant. The facility, which sits on a 12-acre site, has hitting bays and a +/- 250-yard-deep outfield. Owner | Topgolf Engineer | Aria Group General…

Greenwood Village Maintenance Facility

Greenwood Village Maintenance Facility This project involved an addition to the City of Greenwood Village’s existing maintenance facility for the Engineering and Building Department, as well as a remodel of small sections of the existing building. The addition’s electrical distribution system tied back into the existing electrical distribution system, as…

Cube Smart Storage

Cube Smart Storage The scope of work in this new four-story storage facility included a new electrical distribution system, branch lighting and controls, branch power, mechanical power, fire alarm system turn-key, low-voltage rough-in and tele-data cabling. Owner | Columbia Pacific Advisors Engineer | Lenity Architecture, Inc. General contractor | New…

Kaiser Permanente Aurora Centrepoint

Kaiser Permanente Aurora Centrepoint Duro provided electrical construction services for this medical office building addition and renovation. Owner | Kaiser Permanente Engineer | ME Engineers General contractor | Adolfson and Peterson Construction Contract value | $2,068,000 Size | 68,000 square feet

Bison Ridge Recreation Center

Bison Ridge Recreation Center This new recreation center for Commerce City included indoor swimming pools, large gym area, indoor running track, three  basketball courts, gymnastics center, office/admin are, and community rooms. Duro's work included full electrical scope, turn-key fire alarm system, lighting controls and a full exterior color changing lighting…

Denver Curling Center

Denver Curling Center This new facility hosts local curling clubs. Work included electrical distribution, branch wiring and power, installation of LED lighting throughout, lighting control system to meet AHJ requirements, power connections to mechanical equipment, fire alarm system and rough-in for low-voltage systems. Owner | Automotive Services, Inc. Architect | SEM…

AAA Colorado HQ

AAA Colorado HQ Project scope included demolition of existing infrastructure to prepare for a tenant fitout, replace and upgrade the building service, replace and upgrade the building generator/EM system, new branch wiring and power, new LED lighting throughout the whole building, new wireless lighting control system to meet IECC 2015…

First Bank HQ

First Bank HQ This project involved a new four-story addition to an existing bank headquarters. Scope included new LED lighting, IECC compliant lighting controls, new upgraded electrical service, energy efficient mechanical system connections, fire alarm and lightning protection system. Project is pursuing LEED Gold certification. Owner | First Bank Architect | RNL…

Kaiser Permanente renovations

149,000-square-foot, floor-by-floor renovation and 13,000-square-foot addition of a 12th floor. Maintained safe and sterile working conditions and operations for a fully operational and functioning high-volume medical clinic in downtown Denver. Work included complete upgrade of electrical and life safety systems. Owner | Kaiser Permanente Facilities Department Architect | Davis Partnership…