Courtleigh Wirz

Cherry Creek Gables Phase I

Cherry Creek Gables Phase I Design-assist project of an eight-story, 289-unit apartment complex with an integral parking structure. Work included a cast-in-place concrete structure utilizing BIM and Total Station layout for the placement of over 1,600 lighting and system points, as well as electrical distribution, generator/EM distribution, branch wiring and…

SkyHouse Denver

SkyHouse Denver New 26-story high-rise residential apartment building consisting of first-level retail, 354 residential units and a roof-level pool. Adjacent 173,155-square-foot parking structure with 484 parking spaces and first-level retail space. Owner | Novare Group Architect | Smallwood, Reynolds, Stewart & Associates, Inc. Engineer | Jordan & Skala Engineers, Inc.…

Avaya lab relocation

Avaya lab relocation This project involved a fast-track relocation, tenant renovation and downsizing of lab operations into a 101,593-square-foot facility in four months. Duro Electric installed all new switchboards, panel boards, lighting, controls and cable tray, as well as some specially prefabricated wiring devices. Project scope also involved the relocation…

Pepsi Center

Pepsi Center Relocation of Kroenke Sports administrative offices to construct the Blue Sky Grill with mountain themed fixtures and structure.  Work included new offices on the floors above the Ridgeline Restaurant, along with the personal residence for the Kroenke Family and the remodel of the locker rooms for the Pepsi…
1 4 5 6